
HZSF-702 SF6 Gas Dew Point Meter
HZSF-702 SF6 Gas Dew Point Meter Product Description Technical Characteristics And Parameters Measurement Methods 1. Connect SF6 Devices Connect the threaded end of the measuring pipe to the switch joint and tighten it with a wrench. Close the needle valve at the other end of the measuring pipe....
HZSF-702 SF6 Gas Dew Point Meter
Product Description
Technical Characteristics And Parameters
|
Features |
||
|
Smart calibration |
The sensor probe can automatically calibrate the zero point to ensure the readiness for each measurement; |
|
|
Quick and gas-saving |
After turning on the machine and entering the measurement state, the dew point measurement time for each SF6 air barrier is about 5 minutes; |
|
|
Safe and reliable |
It adopts self-locking joints imported from Germany, which are safe, reliable and airtight; |
|
|
Mass storage |
Adopting a large-capacity data storage design, it can store up to 250 sets of test data; |
|
|
High definition display |
Color screen directly display dew point, moisture, temperature, humidity, time, date and dew point curve; |
|
|
Moving measurement |
Built-in large capacity rechargeable lithium battery, a full charge can work for 10 hours; |
|
|
Accurate measurement |
The temperature compensation function is added to ensure the accuracy of the measurement results under various temperature conditions. |
|
|
Local calibration |
This machine comes with calibration function, do not need to connect the computer to complete the data calibration. |
|
|
Technical parameter |
||
|
dew-point |
Measuring range |
-60℃~+ 20℃ |
|
measurement accuracy |
±1℃ |
|
|
ambient temperature |
-40℃~+80℃ |
|
|
environment humidity |
0~100% RH |
|
|
Display device |
4.3-inch color touch screen |
|
|
power supply |
AC 220V;Built-in rechargeable battery: can be used for more than 10 hours on a single charge |
|
|
weight |
4.5Kg |
|
|
size |
300 mm×150 mm×300mm |
|
|
Operating temperature |
-30℃~+60℃ |
|
Measurement Methods
1. Connect SF6 Devices
Connect the threaded end of the measuring pipe to the switch joint and tighten it with a wrench. Close the needle valve at the other end of the measuring pipe. Insert one end of the quick connector on the measuring pipe into the air inlet of the instrument. Insert one end of the exhaust pipe into the exhaust port on the back of the instrument, and place the other end into a trench or window. Finally, connect the switch connector to the SF6 electrical equipment measurement interface and tighten with a wrench.
2. Initialization
Turn on the power switch of the instrument. The instrument will enter the initialization self-calibration process. After calibration, it will automatically enter the measurement page.
3. Check Battery
It is recommended to use DC power first for this instrument. When using DC power, check the battery power displayed in the upper right corner. If the power indicator turns red, please turn off the instrument and charge before continuing to use it.
4. Start Measuring
Fully open the flow valve on the front panel of the dew point meter, then slowly adjust the flow to approximately 0.5 L/min by adjusting the needle valve on the measurement pipe to start measuring the SF6 dew point. The first device takes 5 to 10 minutes to measure, and each subsequent device takes 3 to 5 minutes.
5. Storing Data
After measurement is completed, the data can be saved in the instrument. Press the "OK" key to bring up the operation menu. See the next section for specific operation methods.
6. Measure Other Equipment
After the measurement of one piece of equipment is completed, close the needle valve on the measuring pipe. Remove the switch connector together with the measuring pipe from the SF6 electrical device. If you need to continue measuring other devices, please do not turn off the instrument power and follow the steps above to continue measuring the next device.
7. Measurement Ended
After all equipment measurements are completed, turn off the instrument power.
FAQ
1. When can I get a price quote?
You can contact us online or submit an inquiry. We typically provide a quote within 24 hours after receiving your request.
2. How do you handle after-sale service for overseas customers?
For issues occurring with our products, we offer:
12-month warranty coverage (see details below).
Online technical guidance to troubleshoot problems remotely.
Replacement parts shipped promptly based on your needs.
On-site support (if required): Our engineers can travel abroad to resolve critical issues.
3. What is the warranty period?
Our standard warranty period is 12 months (1 year). During this time, we provide:
Free technical support.
Replacement parts for manufacturing defects.
Solutions tailored to your specific issue.
Products Cases

Company Profile

Certification

Related Products
Hot Tags: hzsf-702 sf6 gas dew point meter, China hzsf-702 sf6 gas dew point meter manufacturers, suppliers, factory, SF6 Gas Purity Analyzer, SF6 Gas Purity Tester
Send Inquiry









